Ge 111 2011 Resistivity


Monday 2011/03/21 Lower Painted Canyon

Group: Kenzie Day, Suzanne Birner, Yingdi Luo, Keven Sutherland, Caitlan Murphy, Jeff Thompson

Line1:

Layout: standard 48 channels, channel 1 at lower end of wash (south end) and channel 48 at upper end. Line was then extended up the canyon with a further 24 channels.
Sample preliminary result along Line 1
Coordinates
Stake 1: 0590539 3718796 69
Stake 48: 0590695 3718978 74

Line 2:

Same Geometry, but line moved approx 50m to the east.
Coordinates
Geophone 1: 0590571 3718772 67
Geophone 48: 0590750 3718923 72

Tuesday 2011/03/21 Lower Painted Canyon

Group: Yiran Ma, Paul Cox, Dunzhu Li, Peter Buhler, Caitlan Murphy, Jeff Thompson

Sample preliminary image

Did two profiles perdendicular to SAF. The first was an 50m above (north) of the fault. The total line linegth was 39 stakes. The last 9 stakes were at right-angles going north.

Line 3:


Line 4:

Line 4 was shortened to just the first 24 stakes due to equipment malfunction.

Wednesday 2011/03/22 Mud Volcanos